Overview

A large Indian bank (can’t disclose the name) operating 461 branches, 851 ATMs, and 300 locations needed to move its core banking platform from a legacy stack to next-generation Finacle in a single day, with zero disruption to customers.

Avekshaa’s P-A-S-S™ Assurance methodology identified and resolved performance, availability, and scalability risks before go-live, resulting in a same-day cut-over with zero post-go-live defects.

Challenge

Migration from Legacy to next-gen Finacle stack across all bank branches and ATMs with one day cut-over and zero post go-live defects across 461 branches and 300 locations.

The big-bang migration approach meant that any missteps, even minor ones, could result in huge ripples in such a critical transition. The disruptions could impact business and brand image, as a consequence result in significant financial losses for the institution.

Big-bang cut-over, no rollback window

All 461 branches and 851 ATMs moved in a single day, no parallel run, no gradual fallback once live.

Multi-vendor stack, no single owner

Legacy and target environments each spanned different vendors, with technical silos between them.

Hard SLA exposure

Missed service-level agreements meant contractual penalties and customer trust damage.

Zero-defect requirement from hour one

No post-launch triage window, banking downtime carries immediate financial and reputational cost.

Finacle Core BankingOracle DB on AIXIBM WebSpherewebMethods ESB

Approach

1. Risk and SLA mapping

Contractual SLAs translated into testable technical parameters, response times, throughput, availability targets across every layer.

2. Stack-wide vulnerability assessment

P-A-S-S™ Assurance methodology applied to review interfaces, code, and customisations at the network, database, storage, application, and integration layers.

3. Bottleneck identification and fixes

  • Database layer: 50+ performance improvements at both architecture and query level.
  • Web-to-app server communication: thread and memory management tuned for high transaction volume.
  • Load simulation: stack-wide testing surfaced issues before go-live, not after.

4. Live monitoring through cut-over

Real-time monitoring during and after the migration window, rather than handing off and waiting for issues to surface.

Results

0
Post-go-live defects
80+
Issues resolved pre-launch
50+
DB-level improvements
3 yrs
Growth headroom, no added hardware

No performance or availability issues were reported by any of the branches or channels and it was business as usual. The migration had been executed smoothly with zero post go-live defects and the system was firing on all cylinders, as predicted by the Avekshaa team who was monitoring the system closely in production. They worked with multiple internal teams across multiple products seamlessly to help make this transition a smooth and silent success.

Why It Matters

Performance and availability risk has to be tested before cut-over, not discovered after, a big-bang migration gives you one shot, with no gradual rollback.
SLA obligations only matter if converted into measurable technical thresholds early. “Maintain uptime” isn’t testable; “response time under X ms at Y concurrent transactions” is.
Database tuning and web-to-app server communication are the two most common failure points in high-transaction banking migrations.

Share:

FAQ

How long did the migration take?

The cut-over itself was completed in a single day across all 461 branches and 851 ATMs, though the assurance and testing work happened over the preceding engagement period.

What is P-A-S-S™ Assurance?

Avekshaa’s methodology for identifying performance, availability, and scalability risks in an application stack before a major change goes live.

How many defects occurred after go-live?

Zero. No branch or channel reported performance or availability issues after the migration.

What technology was involved in the migration?

Finacle Core Banking, Oracle database on AIX, IBM WebSphere Application Server, and a webMethods Enterprise Service Bus.

Download Case Study